Custom Pm - High Precision Iron Spur Gear Sintered Pinion Gear for Gearbox
Package size per unit product 50.00cm * 35.00cm * 15.00cm Gross weight per unit product 20.000kg 1. We have professional
Basic Info
Model NO. | DYDG23419-1 |
Manufacturing Method | Sintered Gear |
Toothed Portion Shape | Spur Gear |
Material | Metal Alloy, Fe, Cu |
Type | Circular Gear |
Customization | Available |
Part Types | Gearbox Gears |
Certificate | Rosh |
Density | 6.5-7.1 g/cm3 |
After-Sales Service Provided | Online Support |
Process | Mold Shaping, Sintering |
Item Name | Metal Powder Metallurgy Products Sintered Gears |
Applicable Industries | Machinery Repair Shops, Manufacturing Plant |
Place of Origin | Guangdong, China |
Condition | New |
Machinery Test Report | Provided |
Surface Finish | Steam Treatment |
Transport Package | Plastic Bag\Carton |
Specification | Custom |
Trademark | OEM |
Origin | China |
HS Code | 8483900090 |
Production Capacity | 3000000pieces/Month |
Packaging & Delivery
Package size per unit product 50.00cm * 35.00cm * 15.00cm Gross weight per unit product 20.000kgProduct Description
Product type | Sintered metal parts / Sector gears |
Material | Stainless steel,Steel(Iron,)Brass,Copper (According to product design requirements) |
Tolerance | ±0.01mm |
Surface Treatment | As your requirement |
Application | Tool industry,Automotive, instrument, electrical equipment, household appliances, furniture, mechanical equipment,daily living equipment, electronic sports equipment, light industry products, sanitation machinery, etc. |
Shape | Any other material and dimension depends on customers' demand. |
QC system | 100% inspection before shipment |
Returned Goods Managing | With quality problem or deviation from drawings |
Warranty | Replacement at all our cost for rejected products |
Payment terms | T/T at sight, Paypal, Western Union,etc. |
Lead time | 7-15 working days as usual,It will based on the detailed order quantity. |
Why Choose Us |
1. We have professional powder metallurgy production equipment and team;
2. We can accompany customers to develop products;
3. Just send an idea that you want to try, you don't even need to know what powder metallurgy;
4. Our sales will reply you within 24 hours to confirm further details and give the estimated quote time;
5. Our team will evaluate your inquiry and provide our offer within next 1~3 working days.
Order Process |
1. You send us drawing or sample.2. We carry through project assessment.3. We give you our design for your confirmation.4. We make the sample and send it to you after you confirmed our design.5. You confirm the sample then place an order and pay us deposit.6. We start producing.7. When the goods is done, you pay us the balance after you confirmed pictures or tracking numbers.8. Trade is done, thank you!!
Additional Capabilities CAD Design Services CAM Programming Services Coordinate Measuring Machines (CMM) Reverse Engineering
Product Show |
Some Parts We Manufacture |
Structural Parts
Gears
About Us |
Design Tips: Powder Metallurgy Gears |
1. Radius > 0.25 mm is required to manufacture the die;
2. Helical teeth should feature a helical angle < 30º in order to limit side pressure on the punches;
3. Introduction of a draft angle > 5º in the upper diameter reduce the tooling cost;
4. The distance between tooth root and central hub diameter must be: > 3 mm (Robust Tooling).
If you want to know more about the product, please send us a message.
The Powder Metallurgy Manufacturing Process |
FAQ |
Q: How can I get the quotation? |
A: Please send us information for quote: drawing, material, weight, quantity and request,w can accept PDF, ISGS, DWG, STEP file format. If you don't have drawing, please send the sample to us,we can quote based on your sample too. |
Q: What's your MOQ? |
A: In general 1000pcs,but can accept low quantity in some special conditions. |
Q: Do you provide samples ? is it free or extra ? |
A: Yes, we could offer the sample for free charge but do not pay the cost of freight. |
Q: What about the leading time for mass production? |
A: Honestly, it depends on the order quantity. Normally, 15 days to 20 days after your deposit if no tooling needed. |
Q: What if the parts are not good? |
A: We can guarantee good quality,but if happened,please contact us immediately, take some pictures, we will check on the problem,and solve it asap. |
Q: What is your terms of payment ? |
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment |
Send to us